header

Reference Documents


1. NASA Notional Spacecraft RFP

  1. RFP Sections B-thru-M (MS Word)

2. SLI Reference Documents

  1. General Environmental Verification Standards (GEVS) For GSFC Flight Programs and Projects [Modified 2.18.2015]
  2. NASA GSFC GEVS for the SLI Business Model Study [Added 2.24.2015] (Excel)
  3. Standard Mission Assurance Requirements [Added 11.25.2014] (MS Word)
  4. NASA MAR rev. E for SLI Business Model Study [Added 2.19.2015] (Excel)
  5. GSFC Rules for the Design, Development, Verification, and Operation of Flight Systems [Modified 2/18/2015]
  6. NASA GOLD Rules for SLI Business Model Study [Added 2.19.2015] (Excel)
  7. AST Checkpoint #1 Briefing [1.24.2014]
  8. Industry & Partner Day Presentations [9.18.2013]
  9. Landsat and Beyond: Sustaining and Enhancing the Nation's Land Imaging Program

3. Landsat Data Continuity Mission (LDCM) Reference Documents

  1. Operational Land Imager (OLI) Top of Atmosphere Radiance Spectra (.xls) [Updated 09.05.2014]
  2. Landsat Worldwide Reference System-2 (WRS-2) Definition
  3. Instrument Mission Assurance Requirements (MAR) [Updated 08.07.2014]
  4. Spacecraft Mission Assurance Requirements (MAR) [Updated 08.07.2014]
  5. LDCM Spacecraft Statement of Work (SOW) [Updated 08.07.2014]
  6. Operational Land Imager (OLI) Statement of Work (SOW) [Updated 08.07.2014]
  7. Operational Land Imager (OLI) Contract Data Requirements List (CDRL) [Updated 08.07.2014]
  8. LDCM Spacecraft Contract Data Requirements List (CDRL) [Updated 08.07.2014]
  9. LDCM Science and Mission Requirements Document
  10. LDCM Spacecraft Requirements Document
  11. Operational Land Imager Special Calibration Test Requirements LDCM
  12. Thermal Infrared Sensor Special Calibration Test Requirements
  13. LDCM MOE Requirements
  14. Operational Land Imager Requirements Document
  15. LDCM Thermal Infrared Sensor Requirements Document
  16. LDCM Observatory Interface Requirements Document
  17. LDCM Environmental Verification Requirements
  18. LDCM Launch Services - Interface Requirements Document

4. Users Forum Documents

  1. Sustainable Land Imaging Users Forum : Operational Uses of Landsat Data [J. Dwyer, 12.04.2013]
  2. Sustainable Land Imaging Architecture Study Team User Forum Panel Session
  3. Application Requirements Worksheet (.pdf) | (.xlsx)

5. Request for Information (RFI) Documents

  1. Sustainable Land Imaging Architecture Study RFI
  2. Landsat 8 Reference Parameters

6. Event Presentations

  1. December 4, 2013 : Sustainable Land Imaging Users Forum
  2. September 18, 2013 : Sustainable Land Architecture Study Industry and Partner Day
  3. April 1, 2014 : Sustainable Land Imaging Architecture Study Interim Status Briefing
NASA logo
Goddard Space Flight Center